As the City Rail Link (CRL) is still operating the Tunnel Boring Machine (TBM) under our current level 4 lockdown conditions some plant & support machinery is required to be commissioned. Obviously any equipment operating in their environment where 2 x 3.45km long tunnels are being developed at depths of up to 42metres underground can potentially present a risk to people & property.
So it is prudent to take steps to mitigate that risk, PSL can help with this risk management by the supply, servicing & ongoing support for fire suppression systems & other fire-fighting equipment that may be required to assist with the safe operation of this equipment in these potentially dangerous environments.
Pictured is a GENIE EWP with a intrinsically safe foam fire suppression system which can be operated both manually & automatically.